Project Overview
Role: Lead Designer
JHA Architecture was appointed as Lead Designer for the delivery of a new petrol filling station in Winsford, providing a modern fuelling facility designed to support the growing needs of the local community while enhancing the site's commercial offering.
Working closely with the client, planning consultants, engineers, specialist designers and contractors, the project was delivered through RIBA Stages 0–7, from initial feasibility and planning through to construction, completion and site oversight.


Key Features
The development brings together the core elements of a modern roadside fuel and retail destination within a coordinated and customer-focused site layout.
- New petrol filling station development
- Modern illuminated fuel canopy
- Multiple fuel dispensing positions
- Convenience retail unit
- Integrated car parking and accessible customer routes

Design Approach
The development was carefully designed to maximise operational efficiency while creating a safe, accessible and welcoming environment for customers. The scheme incorporates fuel dispensing facilities, a convenience retail unit, canopy, forecourt infrastructure, car parking, landscaping and associated service areas within a coordinated site layout.
Particular attention was given to vehicle circulation, pedestrian safety and compliance with current industry standards, enabling the development to operate efficiently while retaining flexibility for future operational requirements.

Operational Impact
The completed petrol filling station provides a modern, efficient and reliable facility for local motorists and the wider community. The carefully planned layout supports smooth vehicle movement, reduces congestion and improves the customer experience.
Throughout construction, JHA Architecture coordinated the multidisciplinary design team, administered the construction contract and carried out site inspections to help ensure the project was delivered safely and in line with the client's operational and commercial objectives.

Sustainability & Future Readiness
The development incorporates energy-efficient lighting, sustainable drainage solutions and carefully considered landscaping to reduce environmental impact while creating an attractive and resilient setting.
Durable materials, efficient building systems and a low-maintenance design support long-term performance, while the site layout allows flexibility as vehicle technologies and customer requirements continue to evolve.
Project Outcome
The finished scheme demonstrates JHA Architecture's ability to deliver complex commercial developments from concept through to completion, coordinating multiple specialist disciplines across the full RIBA Plan of Work.
The result is a contemporary petrol filling station that combines operational efficiency, customer convenience and high-quality design while strengthening local retail and transport infrastructure.
Project Gallery



