NEW BUILD MOTOR VEHICLE TECHNICIAN TRAINING FACILITY FOR DONCASTER GTA
POSTED: 07 July 2011.
Summary Client: Togel Contractors Ltd / Doncaster GTA Principal Contractor: Togel Contractors Ltd Project Cost: £1.35M plus VAT Timescale: 18 weeks Brief Working in partnership with Togel Contractors Ltd, the brief was to design and build a new training facility incorporating a main open plan area for workshops, perimeter classrooms at two levels, with direct vision and balconies overlooking the main training area, together with associated kitchen, toilet and welfare facilities. Proposals The building comprised a steel portal frame with low level brickwork and insulated cladding / curtain walling over to eaves height with a curved profiled sheeted roof. Internally the classrooms wrapped around the main internal workshop / training space, with direct vision allowing direct access between the theory and practical based training.
Summary Client: Togel Contractors Ltd / Doncaster GTA Principal Contractor: Togel Contractors Ltd Project Cost: £1.35M plus VAT Timescale: 18 weeks Brief Working in partnership with Togel Contractors Ltd, the brief was to design and build a new training facility incorporating a main open plan area for workshops, perimeter classrooms at two levels, with direct vision and balconies overlooking the main training area, together with associated kitchen, toilet and welfare facilities. Proposals The building comprised a steel portal frame with low level brickwork and insulated cladding / curtain walling over to eaves height with a curved profiled sheeted roof. Internally the classrooms wrapped around the main internal workshop / training space, with direct vision allowing direct access between the theory and practical based training.
ANAEROBIC DIGESTION PLANT FOR REFOOD (UK) LTD, ..
POSTED: 20 June 2011.
Summary
Client: Refood (UK) Ltd
Principal Contractor: Britcon Ltd
Project Cost: £4,400,000.00
Timescale: 40 weeks
Brief
The construction of a commercial Anaerobic Digestion Plant and Office Block to provide green energy from waste foodstuffs by means of the creation of methane gas in a sealed environment. The electricity produced to .. Read More »
Summary
Client: Refood (UK) Ltd
Principal Contractor: Britcon Ltd
Project Cost: £4,400,000.00
Timescale: 40 weeks
Brief
The construction of a commercial Anaerobic Digestion Plant and Office Block to provide green energy from waste foodstuffs by means of the creation of methane gas in a sealed environment. The electricity produced to .. Read More »
OFFICE BLOCK FOR REFOOD (UK) LTD, DONCASTER
POSTED: 20 June 2011.
Summary
Client: Refood (UK) Ltd
Principal Contractor: Britcon Ltd
Project Cost: £600,000.00
TImescale: 26 weeks
Brief
The construction of a Regional Headquarters for Refood (UK) Ltd to be used in conjunction with an adjacent new Anaerobic Digestion Plant, which would provide both office and amenities for site staff.
Proposals
Given that the office .. Read More »
Summary
Client: Refood (UK) Ltd
Principal Contractor: Britcon Ltd
Project Cost: £600,000.00
TImescale: 26 weeks
Brief
The construction of a Regional Headquarters for Refood (UK) Ltd to be used in conjunction with an adjacent new Anaerobic Digestion Plant, which would provide both office and amenities for site staff.
Proposals
Given that the office .. Read More »
COLD STORE & OFFICES FOR PDM ..
POSTED: 17 June 2011.
Summary Client: PDM Group Ltd Principal Contractor: Ackroyd & .. More »
Summary Client: PDM Group Ltd Principal Contractor: Ackroyd & .. More »