EXTENSION TO FORM NEW SECURE ENTRANCE LOBBY AT HATFIELD CROOKESBROOM PRIMARY SCHOOL POSTED: 11 October 2011.
blog image 1
Summary Client: DMBC Principal Contractor: G Wilkinson Construction Ltd Project Cost: £38,500.00 plus VAT Timescale: 6 weeks Brief We were informed by the client that an increase in safeguarding of the school was required. At present, once visitors were allowed through the main entrance doors they were permitted entry into the main school building, which provided unsecured access to all other areas of the school.               Proposals The works included for an extension to create a secure entrance lobby for visitors to the school. This would permit entry into the school building to liaise with office personnel but further entry beyond this point into the school building would be restricted to authorised personnel only. Disabled access together with weather protection to the entrance formed part and parcel of the works.
PROVISION OF EXTERNAL COVERED WALKWAY & LOCKER .. POSTED: 10 October 2011.

blog image 1 Summary Client: The McAuley Catholic High School Principal Contractor: Clovis Canopies Ltd Project Cost: £41,000.00 plus VAT Timescale: 3 weeks Brief Due to a separate project being undertaken on site to convert the existing Y7 Girls Cloakroom area into a new Learning Resource Space, a need was identified to relocate the existing lockers to an alternative ..  Read More »
HATFIELD VISUAL ARTS COLLEGE, PROVISION OF NEW .. POSTED: 20 July 2011.

blog image 1 Summary Client: Hatfield Visual Arts College Principal Contractor: Togel Contractors Ltd Project Cost: £105,000.00 plus VAT Timescale:  6 weeks Brief We were requested by the client to refurbish an existing food technology classroom to provide a new food catering classroom which could be used by pupils and teaching staff, as the existing did not ..  Read More »
ST MARY'S CATHOLIC PRIMARY .. POSTED: 04 July 2011.
blog image 1
Summary Client: The Diocese of Hallam Principal Contractor: Togel Contractors ..  More »
SACRED HEART CATHOLIC PRIMARY .. POSTED: 28 June 2011.
blog image 1
Summary Client: Sacred Heart Catholic Primary School Principal Contractor: O & P ..  More »
EXTENSIONS AND ALTERATIONS TO .. POSTED: 28 June 2011.
blog image 1
Summary Client:  The Diocese of Hallam Principal Contractor:  O & P ..  More »
OUR LADY OF MOUNT CARMEL .. POSTED: 28 June 2011.
blog image 1
Summary Client: Our Lady of Mount Carmel Catholic Primary School Principal ..  More »
CONVERSION OF REDUNDANT KITCHEN .. POSTED: 16 June 2011.
blog image 1
Summary Client:  North Doncaster Technology College Principal Contractor: N Stones ..  More »
NEW BUILD TECHNOLOGY BLOCK, .. POSTED: 16 June 2011.
blog image 1
Summary Client: Doncaster Metropolitan Borough Council Principal Contractor: Ackroyd ..  More »
OLDER POSTS:
16 June 2011. THE ARMTHORPE SCHOOL, DONCASTER FOR DONCASTER MBC, NEW BUILD TECHNOLOGY BLOCK